Drywall, Joinery

Project Mercury

The redevelopment of Mercury House, 124 Theobalds Road in Holborn
Client
Faithdean Plc
Sector
Commercial
Location
London
Timeline
Autumn 2026 - Winter 2027

The project

This significant project will transform a prominent 1950s commercial building into over 98,000 sq ft of best-in-class, sustainable workspace, seamlessly combining contemporary workplace design with the preservation of its distinctive mid-century character.

The brief

With circular economy principles at the heart of the scheme, the redevelopment retains much of the existing structure and original façade while introducing a range of exceptional workplace amenities, including a dramatic central atrium, rooftop pavilion, landscaped sunken courtyard, fitness facilities, cycle hub and enhanced public realm. The result will be a highly sustainable and future-ready commercial destination in the heart of London.

Our role

As part of our appointment, Oakenwoods Group will deliver:

▪️ External wall linings
▪️ Drylining systems
▪️ Suspended ceilings
▪️ First and second fix carpentry
▪️ Internal doors and architectural ironmongery
▪️ In-house designed and manufactured Specialist Bespoke Joinery

Projects of this calibre reflect the trust our clients place in our people, our expertise and our commitment to delivering exceptional quality at every stage of the construction process.